Engagement Packages

Predictable, fixed-scope packages that take you from discovery to stable day-2 operations — each with industry-standard deliverables and clear timelines.

  1. 01Discovery2–3 weeks
  2. 02Design4–6 weeks
  3. 03Migration6–12 weeks
  4. 04Day-2 Operations3 / 6 / 12 months
DISCOVERY

Discovery

Understand the environment, capture intent, set the baseline.

2–3 weeksIdeal for: Customers starting a refresh program or evaluating Cisco modernization options.

Deliverables

  • Current-state assessment report
  • Requirements register (functional & non-functional)
  • Capacity, performance & growth model
  • Compliance & security baseline (PCI-DSS, HIPAA, SOC 2)
  • Risk register & assumptions log
  • Basis of Design (BOD) v0.1

Timeline

  1. Week 1Stakeholder interviews, environment & topology discovery
  2. Week 2Pain-point analysis, capacity modeling, requirements workshop
  3. Week 3Findings report, BOD draft, recommendation readout

Outcomes

  • Clear scope & success criteria
  • Validated requirements signed off by stakeholders
  • Inputs ready for HLD/LLD design
Most popular
DESIGN

Design

Industry-standard HLD, LLD, BOM, BOQ — implementation-ready.

4–6 weeksIdeal for: Programs with approved requirements ready to move into engineering and procurement.

Deliverables

  • High-Level Design (HLD) — Cisco CVD aligned
  • Low-Level Design (LLD) — addressing, configs, fabric details
  • Bill of Materials (BOM) with Cisco SKUs & licenses
  • Bill of Quantities (BOQ) with itemized pricing
  • Basis of Design (BOD) v1.0
  • Traffic-flow document (N-S, E-W, control & management)
  • Reference configurations per device role

Timeline

  1. Week 1–2Architecture decisions, platform selection, HLD draft
  2. Week 3–4LLD authoring, BOM/BOQ build, peer review
  3. Week 5Customer review cycles & revisions
  4. Week 6Final sign-off & handover to implementation

Outcomes

  • Design approved by customer architecture board
  • Procurement BOM/BOQ ready for PO
  • Engineering team unblocked to build
MIGRATION

Migration

MOPs, test plans and zero-downtime cutover from legacy to Cisco fabric.

6–12 weeksIdeal for: Brownfield programs migrating production traffic to a new Cisco fabric.

Deliverables

  • Method of Procedure (MOP) per cutover wave
  • Risk assessment & backout/rollback plans
  • Network Test Plan (RFC 2544/6349 + acceptance cases)
  • Pre-cutover lab validation results
  • Maintenance window runbooks & comms plan
  • Post-implementation verification (T+24h, T+7d)
  • Migration acceptance & handover document

Timeline

  1. Week 1–2Build & cable new fabric, baseline configs
  2. Week 3–4Lab validation, MOP authoring, dry-run
  3. Week 5–10Phased cutovers (per VLAN/app), nightly validations
  4. Week 11–12Decommission legacy, acceptance, knowledge transfer

Outcomes

  • Production migrated with target downtime ≤ SLA
  • All acceptance test cases passed
  • Legacy infrastructure safely decommissioned
DAY2

Day-2 Operations

Stable production: runbooks, monitoring, training, ongoing support.

3 / 6 / 12 monthsIdeal for: Customers needing operational stability, training, and ongoing senior architect access.

Deliverables

  • Operational Runbook (ITIL v4 aligned)
  • Incident playbooks (link/device down, BGP/EVPN flap, fabric instability)
  • Monitoring & alerting thresholds (CPU, memory, optics, control-plane)
  • Capacity review reports (monthly)
  • PSIRT advisory review (monthly)
  • Knowledge transfer & technical training
  • Quarterly DR/failover test execution

Timeline

  1. Month 1Stabilization, runbook adoption, monitoring tuning
  2. Month 2–3Training delivery, capacity baseline, first DR test
  3. Month 4–12Monthly reviews, advisory tracking, continuous improvement

Outcomes

  • Stable production with measurable MTTR improvements
  • Customer team self-sufficient on Cisco platforms
  • Continuous architectural guidance from senior AI architect

Need a custom blend?

Most enterprise programs combine packages — for example Discovery + Design, or Migration + Day-2. Talk to us and we'll shape the right engagement.

See full capabilities